ADR 0009 — Standards-interop as contracts and a readiness mapping, not runtimes or compliance

Status

Accepted.

Context

To be useful to fusion-control integrators and a commercial/safety audience, MIF must line up with the open standards that ecosystem already uses — the ITER IMAS data model, White-Rabbit timing with EPICS/MARTe2 control systems, and the functional-safety standards (IEC 61508, IEC 60880, DO-254). The risk is twofold: (1) pulling whole runtimes (an IMAS library, an EPICS IOC, a MARTe2 application) into MIF would bloat it and cross the ownership boundary (ADR 0001); (2) claiming "IMAS-compatible", "EPICS-integrated", or worst of all "IEC 61508 compliant" would be an overclaim for a pre-alpha project with no integration deployment or certification — exactly the honesty failure ADR 0005 guards against.

Decision

Ship standards-interop as contracts and a readiness mapping, never as runtimes or compliance:

  1. Trigger-I/O contract (interop/trigger_io.py): typed White-Rabbit TAI timestamps (sub-nanosecond, preserving the trigger latency budget) and an EPICS process-variable naming scheme for the trigger-lane ingress/egress signals. It is data structures and names, not a network or device runtime.
  2. IMAS input mapping (interop/imas_mapping.py): a table mapping each MIF-consumed input onto the ITER IMAS Interface Data Structure and path a consumer would read or publish (magnetics, equilibrium COCOS=17, pf_active). No IMAS library dependency.
  3. Functional-safety readiness mapping (docs/standards/safety_readiness_mapping.md): a self-assessment of MIF-010 + MIF-017 evidence against the public objective categories of IEC 61508 / IEC 60880 / DO-254, with the gaps stated. Explicitly not a SIL/DAL rating, certification, or independent assessment.

Every load-bearing standard/spec name is verified at source before it lands (per the verified-at-source rule); the paywalled standard texts are not quoted.

Consequences

  • Integrators get a concrete seam to build against (timestamp semantics, channel names, IDS paths) without MIF taking on heavyweight runtime dependencies or leaving its ownership lane.
  • The safety posture stays honest: the readiness mapping advertises real evidence (machine-checked proofs, stress injection, coverage) and names the gaps (no certification, no FMEDA, no independent assessment, timing-closure gated).
  • Parts of the seam need sibling or external work to become live (FUSION supplies the equilibrium content; a real EPICS/MARTe2/White-Rabbit deployment is downstream). These remain contracts until then.

Alternatives considered

  • Vendor the runtimes (IMAS library, EPICS IOC, MARTe2 app). Rejected: bloat, ownership-boundary creep, and a maintenance burden for surfaces no current deployment uses.
  • Claim compliance/compatibility. Rejected outright: false for a pre-alpha, uncertified, unassessed project; it would damage all four audiences.
  • Defer standards-interop entirely. Rejected: the contracts and the readiness mapping are buildable today and are what integrators and a commercial audience actually ask for first, ahead of any certification programme.