Phase 3 Multi-Device DLA Manifest¶
Date: 2026-05-06
This manifest records the approved second-backend DLA parity replication run on IBM Quantum hardware.
Preregistration¶
Protocol:
Execution script:
Backend and Budget Gate¶
| Field | Value |
|---|---|
| Backend | ibm_marrakesh |
| Backend class | 156-qubit Heron-class backend |
| Excluded backend | ibm_kingston |
| Live readiness timestamp | 2026-05-06T171231Z |
| Main job | ibm-run-63e0a1af74a38c9c |
| Readout job | ibm-run-0f96961442e05a77 |
| Main circuits | 144 |
| Readout circuits | 4 |
| Total circuits | 148 |
| Main shots | 4096 |
| Readout shots | 8192 |
| Estimated QPU minutes | 1.3566666666666667 |
| Preregistered ceiling | 10 minutes |
Live readiness:
depth min/mean/max: 1 / 214.75 / 414
total-gate min/mean/max: 4 / 548.9121621621622 / 1086
ECR min/mean/max: 0 / 0.0 / 0
The max depth 414 passed the preregistered guard derived from the Phase 2
A+G live envelope. No extra QPU job was submitted outside this circuit matrix.
Artefacts¶
| Artefact | SHA256 |
|---|---|
data/phase3_multidevice_dla/phase3_multidevice_ibm_marrakesh_2026-05-06T171231Z.json |
cf76b66c69fd6901bc2a9e2c527e978a1c3c1347761d6c16656831a7babfa36a |
data/phase3_multidevice_dla/phase3_multidevice_summary_2026-05-06.json |
751965194a1449767c623dcb119c2514be800efcea1a9652d8acf711cd5471eb |
data/phase3_multidevice_dla/phase3_multidevice_row_metrics_2026-05-06.csv |
15f5de37592947452e1b076e50d7f74b23854b3ca579eb489f0809db9b143eec |
data/phase3_multidevice_dla/phase3_multidevice_readout_corrected_summary_2026-05-06.json |
c43e25d56555f4e1a4593185efddbe51877f638b607c9fa84bcfc07c58ae916f |
data/phase3_multidevice_dla/phase3_multidevice_readout_corrected_rows_2026-05-06.csv |
707d9b2767e3d5a635a6919318119653b495b00ca3661247c41fcd3c3756bc33 |
Per-Depth Summary¶
Parity leakage is reported as opposite-parity counts divided by total counts.
Relative asymmetry is (mean_even - mean_odd) / mean_odd.
| Depth | Even leakage | Odd leakage | Relative asymmetry | Interpretation |
|---|---|---|---|---|
4 |
0.082153 |
0.084290 |
-0.025344 |
opposite sign |
6 |
0.105184 |
0.101440 |
+0.036903 |
same sign, small |
8 |
0.123108 |
0.123271 |
-0.001320 |
near zero |
10 |
0.133586 |
0.136983 |
-0.024803 |
opposite sign |
14 |
0.163127 |
0.176229 |
-0.074348 |
opposite sign |
20 |
0.198771 |
0.205892 |
-0.034585 |
opposite sign |
Full-Basis Readout-Corrected Summary¶
The matching ibm_marrakesh full-basis readout calibration is documented in
docs/campaigns/readout_full_basis_manifest_2026-05-06.md. It uses physical qubits
[5,6,7,8] and has assignment-matrix condition number 1.0756988057943142.
| Depth | Corrected even leakage | Corrected odd leakage | Corrected relative asymmetry | Interpretation |
|---|---|---|---|---|
4 |
0.043936 |
0.064233 |
-0.315987 |
opposite sign |
6 |
0.072900 |
0.080663 |
-0.096237 |
opposite sign |
8 |
0.096515 |
0.100098 |
-0.035798 |
opposite sign |
10 |
0.110723 |
0.110939 |
-0.001953 |
near zero |
14 |
0.143522 |
0.150375 |
-0.045574 |
opposite sign |
20 |
0.178952 |
0.188365 |
-0.049971 |
opposite sign |
The full-basis readout correction does not rescue a positive backend-transfer
replication. It strengthens the conservative conclusion that the previously
promoted ibm_kingston sign is backend/calibration/layout sensitive.
Claim Boundary¶
The result is best read as a multi-device boundary condition. It does not
support a simple backend-stable replication of the ibm_kingston Phase 2 A+G
positive leakage-asymmetry pattern.
Supported:
ibm_marrakeshraw-count replication attempt under the preregistered reducedn=4circuit matrix;- mixed sign and mostly opposite-sign leakage asymmetry across the promoted depths;
- evidence that the earlier
ibm_kingstoneffect is backend/calibration/layout sensitive. - full-basis readout-corrected evidence on the matching
ibm_marrakeshfour-qubit layout showing non-positive relative asymmetry across all promoted depths.
Blocked:
- DLA-parity-only causality;
- backend-universal protection;
- monotone scaling;
- broad quantum advantage;
- GUESS mitigation validation;
- full readout-matrix mitigation from the four readout states.
Reproduction¶
Generate the readiness/submission artefact:
./.venv-linux/bin/python scripts/phase3_multidevice_dla_ibm.py \
--backend ibm_marrakesh \
--submit \
--confirm-budget
The generated summary and row metrics are derived from:
No further QPU work is required to recompute the rows above.