Skip to content

Symmetry-Sector Mitigation Planner Fixtures

These no-QPU fixtures lock the planner contract before execution-path integration.

Fixture Status Primitives Blockers
eligible_counts_guess eligible parity_postselection, symmetry_expansion, guess_symmetry_decay none
blocked_missing_counts blocked none raw measurement counts are required before mitigation planning
blocked_missing_guess_observables blocked none GUESS requires noise-scaled symmetry observables
blocked_nonsymmetric_coupling blocked none coupling_matrix must be symmetric for XY parity-sector planning

Raw-count replay fixtures

Fixture Status Applied primitives Deferred primitives Blockers
replay_counts_postselection_expansion applied parity_postselection, symmetry_expansion guess_symmetry_decay GUESS replay requires calibrated noise-scaled symmetry observable rows
replay_blocked_missing_counts blocked none none symmetry-sector plan is blocked: ('raw measurement counts are required before mitigation planning',)

Reproducibility gate

Regenerate and compare the fixtures with:

scpn-bench symmetry-sector-mitigation-gate

Claim boundary

Planner fixtures prove deterministic eligibility/blocker outputs. Replay fixtures prove offline raw-count accounting. They do not mutate circuits, submit hardware jobs, or prove hardware improvement.