S2 Scaling Readiness Index¶
Date: 2026-05-06
This index records the current no-QPU readiness state for S2 quantum-advantage scaling benchmarks. It is a claim-boundary document, not an advantage claim.
Current Status¶
S2 is ready at the lite rehearsal layer. The protocol, required baselines, row schema, validator, lite harness, and claim-boundary report exist. The full N=20 campaign and any hardware rows remain blocked until the heavier baselines, resource accounting, and QPU approval gates are complete.
Canonical Command¶
This regenerates:
data/s2_advantage_scaling/s2_scaling_protocol_2026-05-06.json;data/s2_advantage_scaling/s2_scaling_lite_rows_2026-05-06.json;data/s2_advantage_scaling/s2_scaling_claim_boundary_2026-05-06.json;data/s2_advantage_scaling/s2_scaling_claim_boundary_2026-05-06.md.
Lite Baseline Rows¶
| n | Baseline | Status | Wall time |
|---|---|---|---|
| 4 | classical ODE | ok | 4.621 ms |
| 4 | dense exact diagonalisation | ok | 0.185 ms |
| 4 | sparse eigensolver | ok | 16.122 ms |
| 4 | MPS/TN spoofability | ok | 0.303 ms |
| 4 | Aer/statevector | ok | 29.627 ms |
| 6 | classical ODE | ok | 10.599 ms |
| 6 | dense exact diagonalisation | ok | 20.920 ms |
| 6 | sparse eigensolver | ok | 14.413 ms |
| 6 | MPS/TN spoofability | ok | 0.924 ms |
| 6 | Aer/statevector | ok | 29.307 ms |
The timings are opportunistic local measurements on the current workstation. They prove the protocol path and row schema, not publication-grade crossover positions.
Allowed Claims¶
- The S2 protocol and validation gate are implemented.
- The lite rehearsal path measures all required baseline families at small sizes.
- The current artefacts are suitable for debugging the scaling workflow.
- The MPS/TN row exists as a spoofability diagnostic, not as hardness evidence.
- No hardware was submitted and no QPU time was spent.
Forbidden Claims¶
- Do not claim broad quantum advantage from S2 lite rows.
- Do not claim hardware scaling from S2 lite rows.
- Do not extrapolate crossover positions from the N=4 and N=6 lite rehearsal.
- Do not claim tensor-network hardness until larger MPS/TN rows are measured and interpreted.
- Do not compare QPU budget to classical baselines until preregistered hardware rows exist.
Full-campaign Blockers¶
- [ ] Extend rows to the protocol grid N=4,6,8,10,12,14,16,18,20.
- [x] Add lite-harness memory instrumentation beyond simple estimates.
- [ ] Run MPS/TN diagnostics at larger N with explicit bond caps.
- [ ] Run Aer/statevector rows until the statevector memory gate is reached.
- [ ] Record GPU dense reference rows where CUDA is available.
- [ ] Convert skipped rows into measured rows or justified size-gated failures.
- [ ] Add plot generation only after row validation passes.
- [ ] Add hardware rows only after preregistration, QPU approval, raw-count storage, and analysis gates.
Hardware Boundary¶
Hardware rows are optional in the protocol until credits and a preregistered campaign exist. Missing hardware must degrade the work to a classical scaling/spoofability study. It must not be represented as a hardware quantum advantage result.
IBM Advantage-Run Readiness Gate¶
The S2 claim-boundary report now emits a machine-readable ibm_readiness
decision. A meaningful IBM advantage run remains blocked unless all conditions
below hold:
- row validation passes;
- every required classical and simulator baseline is
okfor every protocol size; - at least one
qpu_hardwarerow is present with preregistered raw-count provenance.
Lite rows, skipped rows, partial no-QPU campaign slices, and hardware-free readiness documents can support workflow maturity, resource planning, and spoofability analysis. They do not justify IBM spend for an advantage claim.
Next S2 Step¶
The next non-QPU step is to add full-grid execution controls around the measured classical and simulator baselines, keeping expensive rows behind explicit size gates.