S2 Scaling Readiness Index

Date: 2026-05-06

This index records the current no-QPU readiness state for S2 quantum-advantage scaling benchmarks. It is a claim-boundary document, not an advantage claim.

Current Status

S2 is ready at the lite rehearsal layer. The protocol, required baselines, row schema, validator, lite harness, and claim-boundary report exist. The full N=20 campaign and any hardware rows remain blocked until the heavier baselines, resource accounting, and QPU approval gates are complete.

Canonical Command

scpn-bench s2-scaling-lite

This regenerates:

  • data/s2_advantage_scaling/s2_scaling_protocol_2026-05-06.json;
  • data/s2_advantage_scaling/s2_scaling_lite_rows_2026-05-06.json;
  • data/s2_advantage_scaling/s2_scaling_claim_boundary_2026-05-06.json;
  • data/s2_advantage_scaling/s2_scaling_claim_boundary_2026-05-06.md.

Lite Baseline Rows

n Baseline Status Wall time
4 classical ODE ok 4.621 ms
4 dense exact diagonalisation ok 0.185 ms
4 sparse eigensolver ok 16.122 ms
4 MPS/TN spoofability ok 0.303 ms
4 Aer/statevector ok 29.627 ms
6 classical ODE ok 10.599 ms
6 dense exact diagonalisation ok 20.920 ms
6 sparse eigensolver ok 14.413 ms
6 MPS/TN spoofability ok 0.924 ms
6 Aer/statevector ok 29.307 ms

The timings are opportunistic local measurements on the current workstation. They prove the protocol path and row schema, not publication-grade crossover positions.

Allowed Claims

  • The S2 protocol and validation gate are implemented.
  • The lite rehearsal path measures all required baseline families at small sizes.
  • The current artefacts are suitable for debugging the scaling workflow.
  • The MPS/TN row exists as a spoofability diagnostic, not as hardness evidence.
  • No hardware was submitted and no QPU time was spent.

Forbidden Claims

  • Do not claim broad quantum advantage from S2 lite rows.
  • Do not claim hardware scaling from S2 lite rows.
  • Do not extrapolate crossover positions from the N=4 and N=6 lite rehearsal.
  • Do not claim tensor-network hardness until larger MPS/TN rows are measured and interpreted.
  • Do not compare QPU budget to classical baselines until preregistered hardware rows exist.

Full-campaign Blockers

  • [ ] Extend rows to the protocol grid N=4,6,8,10,12,14,16,18,20.
  • [x] Add lite-harness memory instrumentation beyond simple estimates.
  • [ ] Run MPS/TN diagnostics at larger N with explicit bond caps.
  • [ ] Run Aer/statevector rows until the statevector memory gate is reached.
  • [ ] Record GPU dense reference rows where CUDA is available.
  • [ ] Convert skipped rows into measured rows or justified size-gated failures.
  • [ ] Add plot generation only after row validation passes.
  • [ ] Add hardware rows only after preregistration, QPU approval, raw-count storage, and analysis gates.

Hardware Boundary

Hardware rows are optional in the protocol until credits and a preregistered campaign exist. Missing hardware must degrade the work to a classical scaling/spoofability study. It must not be represented as a hardware quantum advantage result.

IBM Advantage-Run Readiness Gate

The S2 claim-boundary report now emits a machine-readable ibm_readiness decision. A meaningful IBM advantage run remains blocked unless all conditions below hold:

  • row validation passes;
  • every required classical and simulator baseline is ok for every protocol size;
  • at least one qpu_hardware row is present with preregistered raw-count provenance.

Lite rows, skipped rows, partial no-QPU campaign slices, and hardware-free readiness documents can support workflow maturity, resource planning, and spoofability analysis. They do not justify IBM spend for an advantage claim.

Next S2 Step

The next non-QPU step is to add full-grid execution controls around the measured classical and simulator baselines, keeping expensive rows behind explicit size gates.